| Sr.No | Reference No. | Title | Date of Issue | Due date | Documents |
|---|---|---|---|---|---|
| 61 | Call for Nomination No. IO/21/CFT/70000771/LLU | Framework Contract for Qualification and manufacturing of ITER diagnostic windows | IO21CFT70000771LLU_web.zip | ||
| 62 | Call for Nomination No. IO/21/CFT/70000768/LLU | Framework Contract for Support of Diagnostics Design Activities | IO21CFT70000768LLU_web.zip | ||
| 63 | Call for Expertise No. IO/21/CFE/10022590/INU | Call for Expertise for Support for Propellant Modelling of Disruption Mitigation System | IO21CFE10022590INU_web.zip | ||
| 64 | Call for Expertise No. IO/21/CFE/10022338/INU | Engineering support of LEVI design development and manufacturing for ports with DMS | CFE_10022338_web.zip | ||
| 65 | Call for Expertise No. IO/21/CFE/10022459/INU | HOF and HIRA in support of the development of Equatorial Ports #08 and #17 with integrated diagnostic and Disruption Mitigation Systems | IO21CFE10022459INU_web.zip | ||
| 66 | Call for Expertise No. IO/21/CFE/10022395/INU | Technical administration support for the disruption mitigation system design | Call for Expertise Ref IO21CFE10022395INU_Web.zip | ||
| 67 | Call for Expertise No. IO/21/CFE/10022394/INU | Mechanical engineering support for the disruption mitigation system design focusing on in-vessel design | Call for Expertise Ref IO21CFE10022395INU_Web.zip | ||
| 68 | Call for Expertise No. IO/21/CFE/10022097RP1/EBT | Structural Engineering Expert for the Holistic Integration Team | Call For Expertise- IO21CFE10022097RP1EBT_Web.zip | ||
| 69 | Call for Expertise No. IO/21/CFE/10022097RP3/EBT | Integration Coordination Expert for the Holistic Integration Team | Call For Expertise IO21CFE10022097RP3EBT_Web.zip | ||
| 70 | Call for Expertise No. IO/21/CFE/10022097RP2/EBT | Integration Engineering Expert for the Holistic Integration Team | Call For Expertise_ IO21CFE10022097RP2EBT_Web.zip |