| Corrigendum-1 : Phase-2 - Driver and Final Stage Amplifiers for 2 sets of ITER ICRF Sources |
|
Corrigendum-1-1.pdf (780.08 KB) |
| Reference Document of GeM Bid - Design, manufacturing, component testing, supply and acceptance testing of EC Main High Voltage Power Supply (EC MHVPS) & IC High Voltage Power Supply (IC HVPS) |
|
Reference%20Documents%20for%20the%20GeM%20Bid%20-%20GEM2025B6267679%20for%20EC%20MHVPS%20%26%20IC%20HVPS.zip (48.18 MB) |
| Notice for Pre-Bid Meeting of GeM Bid - Design, manufacturing, component testing, supply and acceptance testing of EC Main High Voltage Power Supply (EC MHVPS) & IC High Voltage Power Supply (IC HVPS) |
|
Notice%20for%20Pre-Bid%20Meeting%20GEM2025B6267679.pdf (424.67 KB) |
| Design, manufacturing, component testing, supply and acceptance testing of EC Main High Voltage Power Supply (EC MHVPS) & IC High Voltage Power Supply (IC HVPS) |
|
GeM%20Bid%20-%20GEM2025B6267679%20for%20EC%20MHVPS%20%26%20IC%20HVPS.zip (12.73 MB) |
| Corrigenudm-1 & Response to Pre-Bid Queries - Design, manufacturing, component testing, supply and acceptance testing of EC Main High Voltage Power Supply (EC MHVPS) & IC High Voltage Power Supply (IC HVPS) |
|
Bid%20Corrigemum-1%20%26%20Response%20to%20Pre-Bid%20Queries.zip (622.88 KB) |