| Design, Manufacturing, Test, Installation and Commissioning of ITER VS3 Power Supply |
|
4. Published GeM Bid- VS3PS.zip (5.15 MB) |
| Applicabe Document for Design, Manufacturing, Test, Installation and Commissioning of ITER VS3 Power Supply |
|
Applicable Documents.zip (123.32 MB) |
| Response to Pre-Bid Queries against Design, Manufacturing, Test, Installation and Commissioning of ITER VS3 Power Supply |
|
Response to pre bid queries of ITER VS3 PS.pdf (352.55 KB) |
| Fabrication, supply and installation of Neutron Moderator and its Support Structure |
|
GeM_bid_moderator_PDF.zip (2 MB) |
| Corrigemdum-1 for Design, Manufacturing, Test, Installation and Commissioning of ITER VS3 Power Supply |
|
Corrigendum-1 - ITER-VS3 PS.pdf (502.36 KB) |