| Corrigendum-1 and Pre-bid meeting details for Closed loop soda-water based heat absorption system of 1.5 MW level |
|
Corri_1_HAS_web.zip (1.24 MB) |
| Fabrication of Pneumatic Air & Chiller Water Piping Distribution System |
|
Published%20GeM%20Bid_2.pdf (89.9 KB) |
| Machining and Supply of Shield Parts of Post Insulator |
|
Publised%20GeM%20Bid-7453388-7.pdf (91.02 KB) |
| High Performance Power Supplies |
|
Published%20GeM%20Bid_0.pdf (105.13 KB) |
| Supply and Installation of PUF Isulation and FRP Resin |
|
e-tender%20CPPP.pdf (271.32 KB) |